skip to Main Content

CASE STUDY

Constitution Center Water feature

The exterior water feature was part of the overall re-positioning of this building, which was once the headquarters for the USDOT.

Rugo fabricated a bright white granite and assembled the water feature with high precision.

Location: Washington, DC
Completion: 2011
Owner: David Nassif Associates
Architect: Smith Group Inc
General Contractor: James G. Davis Construction
Size:
2,000 sqft
Services: Design, fabricate and install granite water feature

Driven by Passion. Dedicated to Excellence.

We lend a sophisticated aesthetic and world-class expertise to large scale and special projects. Clients include religious, civic, cultural and educational institutions, public agencies, private developers, major corporations, and individuals.